My Certificates












Showcasing my qualifications, projects, and professional achievements.
My Projects
Here are the projects I have implemented or contributed to, in addition to my role in maintenance and operation projects, starting from design and technical proposal submission to delivery to the client.
1- 10 RTU for SIO
End User: Saudi Irrigation Organization (SIO), Hassa, KSA
I was part of a team of two engineers, a technician, and a laborer. We assembled 10 RTUs (Motorola ACE3600). It was my first time doing this, and I gained much experience from my colleague in the assembly process. The delivery to the customer was successful.
2- Neariah Lifting Station
End User: National Water Company (NWC), Dammam, KSA
I linked the site to the central SCADA (Topkapi) in Dammam. The communication via GSM modem which, I configured.
3- Dahiya Wells
End User: National Water Company (NWC), Dammam, KSA
I linked the three wells to the central SCADA (Topkapi) in Dammam. The communication via GSM modem which, I configured.








4- Marine Surplus
End User: National Water Company (NWC), Dammam, KSA
I linked the Station to the central SCADA (Topkapi) in Dammam. The communication via GSM modem, which I configured. I made the engineering for Schneider HMI (HMIGTO5310)
5- Iskan Lifting Station
End User: National Water Company (NWC), Hassa, KSA
Assembly for the RTU (Schneider M340). I made the engineering for the RTU by using Control Expert software. I made the engineering for the local SCADA (Topkapi). I linked the Station to the central SCADA (Topkapi) in Dammam. I linked the Station to the central SCADA (Topkapi) in Hassa. The communication via GSM modem, which I configured. I made the engineering for Schneider HMI (HMIGTO5310)
6- Tank 55
End User: National Water Company (NWC), Dammam, KSA
I made the engineering for the new RTU (Schneider M221) by using EcoStruxure Machine Expert - Basic software. I updated the SCADA engineering to relink the Station to the central SCADA (Topkapi) in Dammam. The communication via GSM modem, which I configured. I made the engineering for Schneider HMI (HMIGTO5310)
7- Deyar El Ahssa
End User: National Water Company (NWC), Hassa, KSA
I replaced the RTU from Schneider SCADAPack to Schneider M221. I made the engineering for the new RTU. I updated the engineering for the local SCADA (Stream SCADA). I linked the Station to the central SCADA (Topkapi) in Dammam. I linked the Station to the central SCADA (Topkapi) in Hassa. The communication via GSM modem, which I configured.
8- Jarodiya Pumping Station
End User: National Water Company (NWC), Qatif, KSA
I made the engineering for the new RTU (Schneider M340) by using Control Expert software. I made the engineering for the new local SCADA (Topkapi). I linked the Station to the central SCADA (Topkapi) in Qatif. I linked the Station to the central SCADA (Topkapi) in Dammam. The communication via GSM modem, which I configured.
9- Jarodiya West Lifting Station
End User: National Water Company (NWC), Qatif, KSA
I updated the engineering for the RTU (Motorola ACE3600) I made the engineering for the new local SCADA (Topkapi). I linked the Station to the central SCADA (Topkapi) in Qatif. I made the engineering for Schneider HMI (HMIGTO5310) The communication via GSM modem, which I configured.
10- Jarodiya Pumping Station
End User: National Water Company (NWC), Qatif, KSA
I made a migration between two RTUs, Schneider M340 RTU and Motorola ACE3600 RTU, in one local SCADA (Topkapi). I updated the engineering for the central SCADA (Topkapi) in Qatif.
11- Development for 20 RTUs for Lifting Stations
End User: National Water Company (NWC), Qatif, KSA
I made the engineering for the new 20 RTUs (Sofrel S4W) I updated the engineering for the central SCADA (Aveva System Platform 2023) in Dammam and Qatif.
My Projects
Here are the projects I have implemented or contributed to, in addition to my role in maintenance and operation projects, starting from design and technical proposal submission to delivery to the client.
1- 10 RTU for SIO
End User: Saudi Irrigation Organization (SIO), Hassa, KSA
I was part of a team of two engineers, a technician, and a worker. We assembled 10 RTUs (Motorola ACE3600). It was my first time doing this, and I gained a lot of experience from my colleague in the assembly process. The delivery to the customer was successful.
2- Neariah Lifting Station
End User: National Water Company (NWC), Dammam, KSA
I linked the site to the central SCADA (Topkapi) in Dammam. The communication via GSM modem which, I configured.
3- Dahiya Wells
End User: National Water Company (NWC), Dammam, KSA
I linked the three wells to the central SCADA (Topkapi) in Dammam. The communication via GSM modem which, I configured.
Professional Engineering Services
Offering expertise in system engineering, project management, and automation solutions for diverse industries.
System Engineering Solutions


Specializing in PLCs and RTUs for efficient control processes. Schneider: Twido, M221, and M340. Sofrel RTUs: S4W Siemens: Step5 and Step7(Using TIA) Motorola: ACE3600, Moscad, and MoscadL




Project Management Expertise
Certified PMP professional ensuring successful project delivery and stakeholder satisfaction in engineering projects.
Specializing in SCADA systems for efficient automation and control processes. Aveva System Platform, TopKapi, Stream Scada, Intouch, Citect, and basics of WinCC. All kinds of Schneider HMI.
System Engineering Solutions
Client Feedback
Read what clients say about my engineering and project management skills.
Mahmoud's expertise in PLC and SCADA systems greatly improved our project outcomes. Highly recommend his services for any engineering needs.
John Doe
New York
Working with Mahmoud was a game-changer for our team. His insights and professionalism helped us achieve our goals efficiently and effectively. Truly a valuable asset.
Jane Smith
Los Angeles